GEOGCRS["HS2-IRF", DATUM["HS2 Intermediate Reference Frame", ELLIPSOID["GRS 1980",6378137,298.257222101, LENGTHUNIT["metre",1]]], PRIMEM["Greenwich",0, ANGLEUNIT["degree",0.0174532925199433]], CS[ellipsoidal,2], AXIS["geodetic latitude (Lat)",north, ORDER[1], ANGLEUNIT["degree",0.0174532925199433]], AXIS["geodetic longitude (Lon)",east, ORDER[2], ANGLEUNIT["degree",0.0174532925199433]], USAGE[ SCOPE["Engineering survey for HS2 project phases 1 and 2a."], AREA["United Kingdom (UK) - HS2 phases 1 and 2a railway corridor from London to Birmingham, Lichfield and Crewe."], BBOX[51.45,-2.75,53.3,0]], ID["EPSG",9299], REMARK["Intermediate CRS created to assist the emulation of the ETRS89 / HS2P1+14 SnakeGrid projected CRS through transformation HS2-IRF to ETRS89 (1) (code 9302) used in conjunction with the HS2-TM map projection (code 9301)."]]